Under this contract, BHEL's scope of work includes design, engineering, manufacturing, supply, erection, commissioning, and civil construction.
Presently, BHEL has received a limited notice to proceed (LNTP) from NTPC for initiating the basic engineering work of Main plant package for this upcoming supercritical thermal power plant.
This project further strengthens BHEL's enduring partnership with NTPC, where BHEL has contributed over 57% of NTPC's thermal power installations nationwide.
State-run Bharat Heavy Electricals (BHEL) is engaged in design, engineering, construction, testing, commissioning and servicing of a wide range of products and services to the core sectors of economy. As of 30 September 2024, the Government of India held 63.17% stake in the company.
The scrip fell 2.36% to currently trade at Rs 233.55 on the BSE.
Powered by Capital Market - Live News